Poured to the line.
Concrete and excavation for Calgary homes and small commercial sites. Driveways, garage pads, foundations and the digging underneath.
(403) 555-0142
Services
- 01
Driveways & walks
Driveways, front walks and steps, broom finished or exposed aggregate, sloped to shed meltwater.
- 02
Garage pads
Level, reinforced pads for detached and attached garages, with a thickened edge.
- 03
Foundations
Footings and walls for homes, additions and small buildings, formed and poured to the drawings.
- 04
Basement floors
Smooth, steel-trowelled slabs over a compacted gravel base and vapour barrier.
- 05
Excavation & grading
Digging, backfill and grading to the right elevation, with drainage away from the house.
- 06
Commercial flatwork
Pads, approaches, curbs and sidewalks for small commercial sites.
Selected work
Our name
Why Stringline
Before we dig or pour, we drive two stakes and pull a string tight between them. That line is the grade, the edge and the fall. Everything after is measured to it.
The mark is that setup and nothing else: two stakes and the line between them. Where the job starts, where it ends, and the straight path we hold in between.
- Line orangeThe colour of a mason's line, bright so nobody loses it against dirt. The only bright thing we use.
- SubgradeThe compacted ground under every slab. Most of the work, none of the view.
- Cured greyConcrete once it has reached its strength.
- BoneA slab on finishing day, before the weather has touched it.
How a job runs
-
We walk the site with you, measure, check access for the truck and the machine, and look at where the water goes now.
-
A written quote with the area, slab thickness, base, reinforcement, finish and a start window. One price for the scope written down.
-
Buried utilities are located before any digging. We set the string lines, dig to depth, then place and compact the gravel base in lifts.
-
Forms go up to the line and the steel goes in. We pour, screed, finish and cut the control joints the same day.
-
We protect the slab while it cures and leave you a care sheet. Usually you can walk on it in a day or two and park on it in about a week. Concrete reaches its design strength in about 28 days.
Service area
All four quadrants of Calgary, plus Airdrie, Cochrane, Chestermere and Okotoks.
Request a quote
Request noted.
This is a sample site by Zorya Digital, so nothing was sent or stored. On a real site this request would go straight to the contractor.
