Sample site by Zorya Digital · this company is fictional

Poured to the line.

Concrete and excavation for Calgary homes and small commercial sites. Driveways, garage pads, foundations and the digging underneath.

(403) 555-0142
A freshly broom-finished concrete driveway with the wooden forms still in place.
Sample photos

Services

  1. 01

    Driveways & walks

    Driveways, front walks and steps, broom finished or exposed aggregate, sloped to shed meltwater.

  2. 02

    Garage pads

    Level, reinforced pads for detached and attached garages, with a thickened edge.

  3. 03

    Foundations

    Footings and walls for homes, additions and small buildings, formed and poured to the drawings.

  4. 04

    Basement floors

    Smooth, steel-trowelled slabs over a compacted gravel base and vapour barrier.

  5. 05

    Excavation & grading

    Digging, backfill and grading to the right elevation, with drainage away from the house.

  6. 06

    Commercial flatwork

    Pads, approaches, curbs and sidewalks for small commercial sites.

Selected work

A finished concrete driveway with clean control joints in front of a two-storey house.
Residential drivewaySample photosDriveway and approach, broom finish, saw-cut joints.
An excavator digging a square foundation hole marked out with string lines.
Foundation excavationSample photosDig and subgrade prep for a new foundation.
A smooth new concrete basement floor in an unfinished basement.
Basement floorSample photosTrowelled basement slab, ready for build-out.

Our name

stakelinegrade

Why Stringline

Before we dig or pour, we drive two stakes and pull a string tight between them. That line is the grade, the edge and the fall. Everything after is measured to it.

The mark is that setup and nothing else: two stakes and the line between them. Where the job starts, where it ends, and the straight path we hold in between.

  • Line orangeThe colour of a mason's line, bright so nobody loses it against dirt. The only bright thing we use.
  • SubgradeThe compacted ground under every slab. Most of the work, none of the view.
  • Cured greyConcrete once it has reached its strength.
  • BoneA slab on finishing day, before the weather has touched it.

How a job runs

  1. We walk the site with you, measure, check access for the truck and the machine, and look at where the water goes now.

  2. A written quote with the area, slab thickness, base, reinforcement, finish and a start window. One price for the scope written down.

  3. Buried utilities are located before any digging. We set the string lines, dig to depth, then place and compact the gravel base in lifts.

  4. Forms go up to the line and the steel goes in. We pour, screed, finish and cut the control joints the same day.

  5. We protect the slab while it cures and leave you a care sheet. Usually you can walk on it in a day or two and park on it in about a week. Concrete reaches its design strength in about 28 days.

Service area

Map of Calgary with Airdrie to the north, Cochrane to the west, Chestermere to the east and Okotoks to the south.

All four quadrants of Calgary, plus Airdrie, Cochrane, Chestermere and Okotoks.

Request a quote